Investment by regions
Discover how the investments already approved in the Recovery and Resilience Plan are distributed across the various regions of the country.
Recovery and Resilience Plan in numbers
22,2 billion €
Total investment to be applied by the Recovery and Resilience Plan
1,1 billion €
Total amount of funds already allocated to Nation-wide investments
3,2 billion €
Total amount of funds already invested in municipalities and regions
Geography of investments
The Recovery and Resilience Plan aims to provide the country with a set of tools for the future, seeking to ensure a more resilient economy, a more sustainable relationship with the environment, and more digital processes and functioning.
All of this is contributed by a broad geographical distribution of its investments and reforms, ensuring that both nationally implemented projects and resources applied in all municipalities of the country are invested where they have the greatest impact on the lives of the population.
Distribution of investment by regions
Distribution of investment by regions
Region | Sub-region | Municipality | Approved amount | Amount spent | Percentage of investment |
---|---|---|---|---|---|
North |
Alto Minho
Cávado
Ave
Área Metropolitana do Porto
Alto Tâmega
Tâmega e Sousa
Douro
Terras de Trás-os-Montes
|
Arcos de Valdevez
Caminha
Melgaço
Monção
Paredes de Coura
Ponte da Barca
Ponte de Lima
Valença
Viana do Castelo
Vila Nova de Cerveira
Total
Amares
Barcelos
Braga
Esposende
Terras de Bouro
Vila Verde
Total
Cabeceiras de Basto
Fafe
Guimarães
Póvoa de Lanhoso
Vieira do Minho
Vila Nova de Famalicão
Vizela
Mondim de Basto
Total
Arouca
Espinho
Santa Maria da Feira
Oliveira de Azeméis
São João da Madeira
Vale de Cambra
Gondomar
Maia
Matosinhos
Paredes
Porto
Póvoa de Varzim
Santo Tirso
Valongo
Vila do Conde
Vila Nova de Gaia
Trofa
Total
Boticas
Chaves
Montalegre
Ribeira de Pena
Valpaços
Vila Pouca de Aguiar
Total
Castelo de Paiva
Celorico de Basto
Amarante
Baião
Felgueiras
Lousada
Marco de Canaveses
Paços de Ferreira
Penafiel
Cinfães
Resende
Total
Carrazeda de Ansiães
Freixo de Espada à Cinta
Torre de Moncorvo
Vila Nova de Foz Côa
Alijó
Mesão Frio
Murça
Peso da Régua
Sabrosa
Santa Marta de Penaguião
Vila Real
Armamar
Lamego
Moimenta da Beira
Penedono
São João da Pesqueira
Sernancelhe
Tabuaço
Tarouca
Total
Alfândega da Fé
Bragança
Macedo de Cavaleiros
Miranda do Douro
Mirandela
Mogadouro
Vila Flor
Vimioso
Vinhais
Total
|
8 676 458,00 €
1 423 880,00 €
15 925 121,00 €
14 039 319,00 €
4 098 351,00 €
5 140 723,00 €
19 012 663,00 €
10 163 658,00 €
91 813 800,00 €
8 698 446,00 €
178 992 421,00 €
3 468 922,00 €
76 224 984,00 €
367 886 920,00 €
8 540 683,00 €
1 982 502,00 €
18 653 572,00 €
476 757 583,00 €
3 053 043,00 €
16 228 652,00 €
170 635 411,00 €
7 079 475,00 €
1 464 781,00 €
193 992 825,00 €
14 446 872,00 €
6 230 345,00 €
413 131 405,00 €
17 882 028,00 €
8 288 911,00 €
108 895 140,00 €
50 741 090,00 €
50 213 222,00 €
20 444 509,00 €
71 411 280,00 €
209 380 289,00 €
459 661 941,00 €
43 208 103,00 €
849 527 137,00 €
57 323 297,00 €
57 072 970,00 €
43 854 112,00 €
64 566 534,00 €
416 412 125,00 €
57 561 038,00 €
2 586 443 723,00 €
2 352 915,00 €
34 581 015,00 €
1 652 344,00 €
8 968 645,00 €
2 521 076,00 €
7 527 972,00 €
57 603 966,00 €
12 347 953,00 €
20 002 071,00 €
14 033 850,00 €
43 792 585,00 €
40 377 793,00 €
38 639 459,00 €
18 283 592,00 €
60 128 580,00 €
92 938 455,00 €
7 696 275,00 €
2 322 026,00 €
350 562 642,00 €
2 019 541,00 €
1 852 496,00 €
2 770 421,00 €
2 560 690,00 €
9 773 884,00 €
409 960,00 €
1 915 286,00 €
15 299 481,00 €
1 087 763,00 €
7 672 265,00 €
128 142 398,00 €
2 722 375,00 €
9 886 183,00 €
4 454 978,00 €
690 259,00 €
6 222 505,00 €
2 139 421,00 €
1 404 172,00 €
2 023 078,00 €
203 047 157,00 €
6 957 922,00 €
67 589 142,00 €
6 569 495,00 €
1 752 652,00 €
16 084 210,00 €
2 103 707,00 €
792 249,00 €
1 627 255,00 €
36 028 222,00 €
139 504 855,00 €
|
2 660 938,00 €
585 983,00 €
2 616 829,00 €
3 359 336,00 €
1 525 698,00 €
900 756,00 €
6 829 669,00 €
2 524 264,00 €
22 031 430,00 €
2 698 302,00 €
45 733 206,00 €
1 526 409,00 €
31 598 008,00 €
83 333 133,00 €
3 055 292,00 €
737 063,00 €
5 407 136,00 €
125 657 041,00 €
1 521 175,00 €
7 116 841,00 €
54 061 955,00 €
2 861 375,00 €
758 721,00 €
55 061 873,00 €
6 936 608,00 €
1 547 958,00 €
129 866 506,00 €
2 990 455,00 €
1 844 258,00 €
22 002 767,00 €
15 143 473,00 €
9 807 647,00 €
4 481 890,00 €
12 516 511,00 €
46 797 055,00 €
133 037 398,00 €
13 624 521,00 €
209 091 661,00 €
15 740 371,00 €
10 827 833,00 €
6 526 098,00 €
20 792 561,00 €
76 394 535,00 €
16 817 053,00 €
618 436 089,00 €
686 649,00 €
7 054 870,00 €
1 009 195,00 €
1 953 485,00 €
1 243 300,00 €
1 921 059,00 €
13 868 558,00 €
3 942 054,00 €
5 099 507,00 €
4 579 983,00 €
11 971 029,00 €
12 817 214,00 €
12 658 725,00 €
5 757 334,00 €
11 768 229,00 €
26 846 001,00 €
1 455 538,00 €
1 234 464,00 €
98 130 079,00 €
336 644,00 €
231 416,00 €
1 098 028,00 €
496 548,00 €
2 300 137,00 €
196 001,00 €
581 557,00 €
3 254 133,00 €
405 566,00 €
823 056,00 €
30 006 573,00 €
418 516,00 €
2 626 307,00 €
1 172 211,00 €
231 913,00 €
1 687 886,00 €
666 802,00 €
473 847,00 €
995 334,00 €
48 002 476,00 €
2 023 593,00 €
16 731 885,00 €
1 836 681,00 €
653 719,00 €
5 767 306,00 €
1 295 247,00 €
473 891,00 €
383 305,00 €
4 484 170,00 €
33 649 798,00 €
|
4,85 %
0,80 %
8,90 %
7,84 %
2,29 %
2,87 %
10,62 %
5,68 %
51,29 %
4,86 %
0,73 %
15,99 %
77,16 %
1,79 %
0,42 %
3,91 %
0,74 %
3,93 %
41,30 %
1,71 %
0,35 %
46,96 %
3,50 %
1,51 %
0,69 %
0,32 %
4,21 %
1,96 %
1,94 %
0,79 %
2,76 %
8,10 %
17,77 %
1,67 %
32,85 %
2,22 %
2,21 %
1,70 %
2,50 %
16,10 %
2,23 %
4,08 %
60,03 %
2,87 %
15,57 %
4,38 %
13,07 %
3,52 %
5,71 %
4,00 %
12,49 %
11,52 %
11,02 %
5,22 %
17,15 %
26,51 %
2,20 %
0,66 %
0,99 %
0,91 %
1,36 %
1,26 %
4,81 %
0,20 %
0,94 %
7,53 %
0,54 %
3,78 %
63,11 %
1,34 %
4,87 %
2,19 %
0,34 %
3,06 %
1,05 %
0,69 %
1,00 %
4,99 %
48,45 %
4,71 %
1,26 %
11,53 %
1,51 %
0,57 %
1,17 %
25,83 %
|
Center |
Oeste
Região de Aveiro
Região de Coimbra
Região de Leiria
Viseu Dão Lafões
Beira Baixa
Médio Tejo
Beiras e Serra da Estrela
|
Alcobaça
Bombarral
Caldas da Rainha
Nazaré
Óbidos
Peniche
Alenquer
Arruda dos Vinhos
Cadaval
Lourinhã
Sobral de Monte Agraço
Torres Vedras
Total
Águeda
Albergaria-a-Velha
Anadia
Aveiro
Estarreja
Ílhavo
Murtosa
Oliveira do Bairro
Ovar
Sever do Vouga
Vagos
Total
Mealhada
Arganil
Cantanhede
Coimbra
Condeixa-a-Nova
Figueira da Foz
Góis
Lousã
Mira
Miranda do Corvo
Montemor-o-Velho
Oliveira do Hospital
Pampilhosa da Serra
Penacova
Penela
Soure
Tábua
Vila Nova de Poiares
Mortágua
Total
Alvaiázere
Ansião
Batalha
Castanheira de Pêra
Figueiró dos Vinhos
Leiria
Marinha Grande
Pedrógão Grande
Pombal
Porto de Mós
Total
Aguiar da Beira
Carregal do Sal
Castro Daire
Mangualde
Nelas
Oliveira de Frades
Penalva do Castelo
Santa Comba Dão
São Pedro do Sul
Sátão
Tondela
Vila Nova de Paiva
Viseu
Vouzela
Total
Castelo Branco
Idanha-a-Nova
Oleiros
Penamacor
Proença-a-Nova
Vila Velha de Ródão
Total
Sertã
Vila de Rei
Abrantes
Alcanena
Constância
Entroncamento
Ferreira do Zêzere
Mação
Sardoal
Tomar
Torres Novas
Vila Nova da Barquinha
Ourém
Total
Belmonte
Covilhã
Fundão
Almeida
Celorico da Beira
Figueira de Castelo Rodrigo
Fornos de Algodres
Gouveia
Guarda
Manteigas
Mêda
Pinhel
Sabugal
Seia
Trancoso
Total
|
31 451 408,00 €
4 509 169,00 €
41 404 097,00 €
20 982 098,00 €
6 626 820,00 €
23 166 075,00 €
24 612 598,00 €
17 755 265,00 €
2 722 319,00 €
4 261 367,00 €
1 002 485,00 €
35 459 133,00 €
213 952 835,00 €
152 058 617,00 €
16 631 925,00 €
22 951 240,00 €
233 777 292,00 €
134 765 260,00 €
85 582 985,00 €
10 571 832,00 €
21 705 906,00 €
35 666 773,00 €
5 650 132,00 €
10 580 106,00 €
729 942 068,00 €
1 597 155,00 €
7 082 911,00 €
25 137 550,00 €
318 592 215,00 €
9 013 089,00 €
93 918 421,00 €
1 613 053,00 €
5 371 826,00 €
6 189 071,00 €
2 618 407,00 €
5 168 709,00 €
35 163 122,00 €
9 442 854,00 €
6 421 217,00 €
882 016,00 €
2 304 264,00 €
6 328 769,00 €
2 582 828,00 €
4 366 150,00 €
543 793 629,00 €
1 570 584,00 €
5 802 993,00 €
22 195 780,00 €
3 259 763,00 €
1 950 603,00 €
149 354 124,00 €
94 510 644,00 €
2 724 165,00 €
41 142 497,00 €
17 702 555,00 €
340 213 710,00 €
2 606 671,00 €
6 141 710,00 €
4 627 588,00 €
80 092 333,00 €
8 223 418,00 €
15 680 883,00 €
5 302 541,00 €
1 593 820,00 €
7 675 084,00 €
2 864 424,00 €
24 658 005,00 €
2 156 706,00 €
89 188 418,00 €
4 427 905,00 €
255 239 508,00 €
44 109 363,00 €
7 660 521,00 €
14 187 230,00 €
1 076 973,00 €
1 965 386,00 €
28 451 495,00 €
97 450 969,00 €
5 493 308,00 €
2 968 213,00 €
15 752 325,00 €
27 824 888,00 €
33 568 452,00 €
27 896 472,00 €
14 508 134,00 €
1 781 017,00 €
2 269 934,00 €
31 589 920,00 €
25 046 690,00 €
3 084 374,00 €
23 604 157,00 €
215 387 884,00 €
1 876 323,00 €
59 625 605,00 €
38 324 108,00 €
4 377 408,00 €
4 611 954,00 €
939 564,00 €
3 920 595,00 €
3 847 799,00 €
46 060 121,00 €
988 101,00 €
792 257,00 €
2 607 807,00 €
2 207 919,00 €
20 683 246,00 €
3 298 510,00 €
194 161 317,00 €
|
7 636 203,00 €
1 237 264,00 €
10 805 103,00 €
3 502 478,00 €
1 553 331,00 €
5 158 176,00 €
4 095 239,00 €
4 694 245,00 €
1 140 555,00 €
1 721 672,00 €
547 946,00 €
8 187 125,00 €
50 279 337,00 €
34 816 123,00 €
4 681 613,00 €
7 002 721,00 €
60 195 936,00 €
21 814 968,00 €
22 114 011,00 €
9 934 189,00 €
5 073 245,00 €
8 636 720,00 €
2 069 880,00 €
3 198 099,00 €
179 537 506,00 €
911 054,00 €
2 275 327,00 €
7 699 253,00 €
82 461 958,00 €
1 424 400,00 €
21 934 816,00 €
414 742,00 €
1 382 056,00 €
2 616 739,00 €
929 705,00 €
1 647 984,00 €
8 422 621,00 €
2 619 572,00 €
2 058 675,00 €
444 856,00 €
1 054 596,00 €
1 634 839,00 €
746 047,00 €
1 340 001,00 €
142 019 240,00 €
501 169,00 €
1 666 640,00 €
5 992 258,00 €
410 743,00 €
633 960,00 €
53 053 484,00 €
22 987 074,00 €
700 648,00 €
11 025 423,00 €
5 414 004,00 €
102 385 403,00 €
687 431,00 €
1 176 331,00 €
1 777 492,00 €
23 056 975,00 €
2 283 107,00 €
4 069 840,00 €
1 048 214,00 €
625 820,00 €
2 417 983,00 €
990 740,00 €
6 567 593,00 €
404 468,00 €
28 108 144,00 €
1 273 928,00 €
74 488 064,00 €
9 947 771,00 €
2 140 437,00 €
3 349 263,00 €
313 254,00 €
843 326,00 €
2 742 422,00 €
19 336 472,00 €
1 682 559,00 €
1 498 855,00 €
7 778 970,00 €
4 416 584,00 €
8 522 229,00 €
5 164 878,00 €
549 472,00 €
907 965,00 €
629 511,00 €
6 786 896,00 €
6 472 460,00 €
1 092 090,00 €
7 430 870,00 €
52 933 337,00 €
370 645,00 €
15 389 804,00 €
10 053 233,00 €
766 477,00 €
630 129,00 €
465 153,00 €
998 442,00 €
1 183 200,00 €
9 561 622,00 €
274 740,00 €
437 765,00 €
720 295,00 €
848 416,00 €
4 356 487,00 €
1 035 147,00 €
47 091 556,00 €
|
14,70 %
2,11 %
19,35 %
9,81 %
3,10 %
10,83 %
11,50 %
8,30 %
1,27 %
1,99 %
0,47 %
16,57 %
20,83 %
2,28 %
3,14 %
32,03 %
18,46 %
11,72 %
1,45 %
2,97 %
4,89 %
0,77 %
1,45 %
0,29 %
1,30 %
4,62 %
58,59 %
1,66 %
17,27 %
0,30 %
0,99 %
1,14 %
0,48 %
0,95 %
6,47 %
1,74 %
1,18 %
0,16 %
0,42 %
1,16 %
0,47 %
0,80 %
0,46 %
1,71 %
6,52 %
0,96 %
0,57 %
43,90 %
27,78 %
0,80 %
12,09 %
5,20 %
1,02 %
2,41 %
1,81 %
31,38 %
3,22 %
6,14 %
2,08 %
0,62 %
3,01 %
1,12 %
9,66 %
0,84 %
34,94 %
1,73 %
45,26 %
7,86 %
14,56 %
1,11 %
2,02 %
29,20 %
2,55 %
1,38 %
7,31 %
12,92 %
15,59 %
12,95 %
6,74 %
0,83 %
1,05 %
14,67 %
11,63 %
1,43 %
10,96 %
0,97 %
30,71 %
19,74 %
2,25 %
2,38 %
0,48 %
2,02 %
1,98 %
23,72 %
0,51 %
0,41 %
1,34 %
1,14 %
10,65 %
1,70 %
|
Lisbon Metropolitan Area |
Lisbon Metropolitan Area
|
Cascais
Lisboa
Loures
Mafra
Oeiras
Sintra
Vila Franca de Xira
Amadora
Odivelas
Alcochete
Almada
Barreiro
Moita
Montijo
Palmela
Seixal
Sesimbra
Setúbal
Total
|
74 352 548,00 €
2 070 637 718,00 €
306 422 750,00 €
87 721 366,00 €
249 502 427,00 €
117 304 992,00 €
90 796 067,00 €
128 894 976,00 €
223 474 176,00 €
13 016 109,00 €
68 280 695,00 €
53 835 367,00 €
20 429 091,00 €
23 525 451,00 €
47 409 747,00 €
83 420 912,00 €
11 244 829,00 €
207 188 515,00 €
3 877 457 735,00 €
|
19 394 482,00 €
508 346 424,00 €
31 183 475,00 €
9 476 640,00 €
48 399 607,00 €
34 572 464,00 €
15 199 540,00 €
49 088 748,00 €
25 945 103,00 €
3 143 077,00 €
16 432 866,00 €
11 132 863,00 €
4 397 753,00 €
4 578 539,00 €
8 671 570,00 €
27 001 580,00 €
3 954 457,00 €
42 146 386,00 €
863 065 575,00 €
|
1,92 %
53,40 %
7,90 %
2,26 %
6,43 %
3,03 %
2,34 %
3,32 %
5,76 %
0,34 %
1,76 %
1,39 %
0,53 %
0,61 %
1,22 %
2,15 %
0,29 %
5,34 %
|
Alentejo |
Alentejo Litoral
Baixo Alentejo
Lezíria do Tejo
Alto Alentejo
Alentejo Central
|
Odemira
Alcácer do Sal
Grândola
Santiago do Cacém
Sines
Total
Aljustrel
Almodôvar
Alvito
Barrancos
Beja
Castro Verde
Cuba
Ferreira do Alentejo
Mértola
Moura
Ourique
Serpa
Vidigueira
Total
Azambuja
Almeirim
Alpiarça
Benavente
Cartaxo
Chamusca
Coruche
Golegã
Rio Maior
Salvaterra de Magos
Santarém
Total
Alter do Chão
Arronches
Avis
Campo Maior
Castelo de Vide
Crato
Elvas
Fronteira
Gavião
Marvão
Monforte
Nisa
Ponte de Sôr
Portalegre
Sousel
Total
Alandroal
Arraiolos
Borba
Estremoz
Évora
Montemor-o-Novo
Mora
Mourão
Portel
Redondo
Reguengos de Monsaraz
Vendas Novas
Viana do Alentejo
Vila Viçosa
Total
|
6 073 399,00 €
4 035 708,00 €
52 691 160,00 €
57 810 160,00 €
39 926 741,00 €
160 537 168,00 €
38 515 123,00 €
937 360,00 €
2 897 445,00 €
1 129 464,00 €
73 648 654,00 €
30 949 442,00 €
952 057,00 €
24 199 578,00 €
67 663 261,00 €
2 049 635,00 €
2 337 906,00 €
1 499 249,00 €
1 846 031,00 €
248 625 205,00 €
11 048 104,00 €
1 726 321,00 €
2 250 555,00 €
31 884 710,00 €
6 963 289,00 €
6 434 919,00 €
4 182 071,00 €
2 754 939,00 €
30 512 724,00 €
4 385 860,00 €
66 235 947,00 €
168 379 439,00 €
299 546,00 €
940 452,00 €
627 044,00 €
20 180 147,00 €
476 483,00 €
612 472,00 €
21 582 616,00 €
330 976,00 €
787 379,00 €
1 322 941,00 €
1 155 070,00 €
11 218 125,00 €
13 971 383,00 €
183 825 242,00 €
847 731,00 €
258 177 607,00 €
2 468 207,00 €
1 967 694,00 €
1 308 195,00 €
4 407 197,00 €
111 363 416,00 €
7 993 404,00 €
1 710 287,00 €
1 058 947,00 €
889 586,00 €
1 106 578,00 €
5 486 622,00 €
3 167 154,00 €
651 326,00 €
4 699 993,00 €
148 278 606,00 €
|
1 970 296,00 €
743 204,00 €
14 908 447,00 €
14 585 399,00 €
9 715 097,00 €
41 922 444,00 €
8 787 281,00 €
535 042,00 €
474 867,00 €
106 169,00 €
16 115 371,00 €
455 564,00 €
325 311,00 €
6 941 950,00 €
7 046 457,00 €
856 142,00 €
494 140,00 €
618 144,00 €
615 828,00 €
43 372 267,00 €
3 625 731,00 €
659 140,00 €
790 639,00 €
7 085 538,00 €
1 326 205,00 €
894 447,00 €
2 279 433,00 €
702 341,00 €
4 823 651,00 €
830 169,00 €
16 240 054,00 €
39 257 348,00 €
166 846,00 €
123 798,00 €
195 966,00 €
3 443 417,00 €
255 261,00 €
281 586,00 €
3 251 534,00 €
179 528,00 €
362 555,00 €
209 104,00 €
326 906,00 €
993 141,00 €
3 297 489,00 €
25 481 608,00 €
321 011,00 €
38 889 750,00 €
570 412,00 €
788 419,00 €
571 761,00 €
1 776 969,00 €
28 812 475,00 €
889 797,00 €
504 981,00 €
256 316,00 €
370 582,00 €
357 431,00 €
1 754 600,00 €
1 201 751,00 €
309 636,00 €
1 126 673,00 €
39 291 804,00 €
|
3,78 %
2,51 %
32,82 %
36,01 %
24,87 %
15,49 %
0,38 %
1,17 %
0,45 %
29,62 %
12,45 %
0,38 %
9,73 %
27,21 %
0,82 %
0,94 %
0,60 %
0,74 %
6,56 %
1,03 %
1,34 %
18,94 %
4,14 %
3,82 %
2,48 %
1,64 %
18,12 %
2,60 %
39,34 %
0,12 %
0,36 %
0,24 %
7,82 %
0,18 %
0,24 %
8,36 %
0,13 %
0,30 %
0,51 %
0,45 %
4,35 %
5,41 %
71,20 %
0,33 %
1,66 %
1,33 %
0,88 %
2,97 %
75,10 %
5,39 %
1,15 %
0,71 %
0,60 %
0,75 %
3,70 %
2,14 %
0,44 %
3,17 %
|
Algarve |
Algarve
|
Albufeira
Alcoutim
Aljezur
Castro Marim
Faro
Lagoa
Lagos
Loulé
Monchique
Olhão
Portimão
São Brás de Alportel
Silves
Tavira
Vila do Bispo
Vila Real de Santo António
Total
|
70 165 608,00 €
12 280 743,00 €
789 262,00 €
4 751 480,00 €
102 279 780,00 €
12 958 895,00 €
17 509 547,00 €
39 324 900,00 €
9 076 996,00 €
40 883 226,00 €
26 237 901,00 €
1 634 901,00 €
27 022 194,00 €
16 699 296,00 €
3 790 337,00 €
24 672 919,00 €
410 077 987,00 €
|
12 180 006,00 €
1 212 831,00 €
363 997,00 €
748 998,00 €
21 918 038,00 €
1 471 715,00 €
1 575 964,00 €
11 326 093,00 €
129 101,00 €
7 192 646,00 €
4 755 837,00 €
551 139,00 €
3 559 647,00 €
2 170 182,00 €
466 712,00 €
13 115 522,00 €
82 738 428,00 €
|
17,11 %
2,99 %
0,19 %
1,16 %
24,94 %
3,16 %
4,27 %
9,59 %
2,21 %
9,97 %
6,40 %
0,40 %
6,59 %
4,07 %
0,92 %
6,02 %
|
Autonomous Region of the Azores |
Autonomous Region of the Azores
|
Vila do Porto
Lagoa
Nordeste
Ponta Delgada
Povoação
Ribeira Grande
Vila Franca do Campo
Angra do Heroísmo
Praia da Vitória
Santa Cruz da Graciosa
Calheta
Velas
Lajes do Pico
Madalena
São Roque do Pico
Horta
Lajes das Flores
Santa Cruz das Flores
Corvo
Total
|
8 206 966,00 €
15 919 086,00 €
3 943 216,00 €
324 337 880,00 €
798 762,00 €
84 277 619,00 €
7 281 606,00 €
105 669 238,00 €
5 020 135,00 €
537 026,00 €
465 054,00 €
904 342,00 €
1 229 339,00 €
8 554 077,00 €
360 064,00 €
40 231 196,00 €
706 349,00 €
217 217,00 €
78 257,00 €
608 737 427,00 €
|
2 886 606,00 €
3 882 483,00 €
1 065 086,00 €
96 057 501,00 €
265 644,00 €
9 834 226,00 €
941 563,00 €
24 442 855,00 €
1 312 328,00 €
348 135,00 €
311 567,00 €
524 010,00 €
214 985,00 €
1 350 567,00 €
169 168,00 €
12 174 844,00 €
44 841,00 €
127 831,00 €
62 632,00 €
156 016 871,00 €
|
1,35 %
2,62 %
0,65 %
53,28 %
0,13 %
13,84 %
1,20 %
17,36 %
0,82 %
0,09 %
0,08 %
0,15 %
0,20 %
1,41 %
0,06 %
6,61 %
0,12 %
0,04 %
0,01 %
|
Autonomous Region of Madeira |
Autonomous Region of Madeira
|
Calheta
Câmara de Lobos
Funchal
Machico
Ponta do Sol
Porto Moniz
Ribeira Brava
Santa Cruz
Santana
São Vicente
Porto Santo
Total
|
835 954,00 €
13 597 584,00 €
518 258 153,00 €
2 376 151,00 €
3 919 322,00 €
115 500,00 €
3 735 487,00 €
19 307 882,00 €
259 475,00 €
36 624 865,00 €
18 779 263,00 €
617 809 634,00 €
|
309 404,00 €
912 267,00 €
104 487 071,00 €
563 714,00 €
710 886,00 €
32 102,00 €
1 356 693,00 €
2 860 686,00 €
104 147,00 €
6 987 684,00 €
4 508 318,00 €
122 832 971,00 €
|
0,14 %
2,20 %
83,89 %
0,38 %
0,63 %
0,02 %
0,60 %
3,13 %
0,04 %
5,93 %
3,04 %
|
Nation-wide investment |
|
|
4 270 349 768,00 €
|
1 113 379 679,00 €
|
|
Distribution of investment by regions
Region
North
:Sub-region
Alto Minho
:Municipality
Arcos de Valdevez
:Approved amount
: 8676458 €,8 676 458,00 €
Amount spent
: 2660938 €,2 660 938,00 €
Percentage of investment
: 4,85 %4,85 %
Municipality
Caminha
:Approved amount
: 1423880 €,1 423 880,00 €
Amount spent
: 585983 €,585 983,00 €
Percentage of investment
: 0,8 %0,80 %
Municipality
Melgaço
:Approved amount
: 15925121 €,15 925 121,00 €
Amount spent
: 2616829 €,2 616 829,00 €
Percentage of investment
: 8,9 %8,90 %
Municipality
Monção
:Approved amount
: 14039319 €,14 039 319,00 €
Amount spent
: 3359336 €,3 359 336,00 €
Percentage of investment
: 7,84 %7,84 %
Municipality
Paredes de Coura
:Approved amount
: 4098351 €,4 098 351,00 €
Amount spent
: 1525698 €,1 525 698,00 €
Percentage of investment
: 2,29 %2,29 %
Municipality
Ponte da Barca
:Approved amount
: 5140723 €,5 140 723,00 €
Amount spent
: 900756 €,900 756,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Ponte de Lima
:Approved amount
: 19012663 €,19 012 663,00 €
Amount spent
: 6829669 €,6 829 669,00 €
Percentage of investment
: 10,62 %10,62 %
Municipality
Valença
:Approved amount
: 10163658 €,10 163 658,00 €
Amount spent
: 2524264 €,2 524 264,00 €
Percentage of investment
: 5,68 %5,68 %
Municipality
Viana do Castelo
:Approved amount
: 91813800 €,91 813 800,00 €
Amount spent
: 22031430 €,22 031 430,00 €
Percentage of investment
: 51,29 %51,29 %
Municipality
Vila Nova de Cerveira
:Approved amount
: 8698446 €,8 698 446,00 €
Amount spent
: 2698302 €,2 698 302,00 €
Percentage of investment
: 4,86 %4,86 %
Total
Approved amount
: 178992421 €,178 992 421,00 €
Amount spent
: 45733206 €,45 733 206,00 €
Percentage of investment
Sub-region
Cávado
:Municipality
Amares
:Approved amount
: 3468922 €,3 468 922,00 €
Amount spent
: 1526409 €,1 526 409,00 €
Percentage of investment
: 0,73 %0,73 %
Municipality
Barcelos
:Approved amount
: 76224984 €,76 224 984,00 €
Amount spent
: 31598008 €,31 598 008,00 €
Percentage of investment
: 15,99 %15,99 %
Municipality
Braga
:Approved amount
: 367886920 €,367 886 920,00 €
Amount spent
: 83333133 €,83 333 133,00 €
Percentage of investment
: 77,16 %77,16 %
Municipality
Esposende
:Approved amount
: 8540683 €,8 540 683,00 €
Amount spent
: 3055292 €,3 055 292,00 €
Percentage of investment
: 1,79 %1,79 %
Municipality
Terras de Bouro
:Approved amount
: 1982502 €,1 982 502,00 €
Amount spent
: 737063 €,737 063,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Vila Verde
:Approved amount
: 18653572 €,18 653 572,00 €
Amount spent
: 5407136 €,5 407 136,00 €
Percentage of investment
: 3,91 %3,91 %
Total
Approved amount
: 476757583 €,476 757 583,00 €
Amount spent
: 125657041 €,125 657 041,00 €
Percentage of investment
Sub-region
Ave
:Municipality
Cabeceiras de Basto
:Approved amount
: 3053043 €,3 053 043,00 €
Amount spent
: 1521175 €,1 521 175,00 €
Percentage of investment
: 0,74 %0,74 %
Municipality
Fafe
:Approved amount
: 16228652 €,16 228 652,00 €
Amount spent
: 7116841 €,7 116 841,00 €
Percentage of investment
: 3,93 %3,93 %
Municipality
Guimarães
:Approved amount
: 170635411 €,170 635 411,00 €
Amount spent
: 54061955 €,54 061 955,00 €
Percentage of investment
: 41,3 %41,30 %
Municipality
Póvoa de Lanhoso
:Approved amount
: 7079475 €,7 079 475,00 €
Amount spent
: 2861375 €,2 861 375,00 €
Percentage of investment
: 1,71 %1,71 %
Municipality
Vieira do Minho
:Approved amount
: 1464781 €,1 464 781,00 €
Amount spent
: 758721 €,758 721,00 €
Percentage of investment
: 0,35 %0,35 %
Municipality
Vila Nova de Famalicão
:Approved amount
: 193992825 €,193 992 825,00 €
Amount spent
: 55061873 €,55 061 873,00 €
Percentage of investment
: 46,96 %46,96 %
Municipality
Vizela
:Approved amount
: 14446872 €,14 446 872,00 €
Amount spent
: 6936608 €,6 936 608,00 €
Percentage of investment
: 3,5 %3,50 %
Municipality
Mondim de Basto
:Approved amount
: 6230345 €,6 230 345,00 €
Amount spent
: 1547958 €,1 547 958,00 €
Percentage of investment
: 1,51 %1,51 %
Total
Approved amount
: 413131405 €,413 131 405,00 €
Amount spent
: 129866506 €,129 866 506,00 €
Percentage of investment
Sub-region
Área Metropolitana do Porto
:Municipality
Arouca
:Approved amount
: 17882028 €,17 882 028,00 €
Amount spent
: 2990455 €,2 990 455,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Espinho
:Approved amount
: 8288911 €,8 288 911,00 €
Amount spent
: 1844258 €,1 844 258,00 €
Percentage of investment
: 0,32 %0,32 %
Municipality
Santa Maria da Feira
:Approved amount
: 108895140 €,108 895 140,00 €
Amount spent
: 22002767 €,22 002 767,00 €
Percentage of investment
: 4,21 %4,21 %
Municipality
Oliveira de Azeméis
:Approved amount
: 50741090 €,50 741 090,00 €
Amount spent
: 15143473 €,15 143 473,00 €
Percentage of investment
: 1,96 %1,96 %
Municipality
São João da Madeira
:Approved amount
: 50213222 €,50 213 222,00 €
Amount spent
: 9807647 €,9 807 647,00 €
Percentage of investment
: 1,94 %1,94 %
Municipality
Vale de Cambra
:Approved amount
: 20444509 €,20 444 509,00 €
Amount spent
: 4481890 €,4 481 890,00 €
Percentage of investment
: 0,79 %0,79 %
Municipality
Gondomar
:Approved amount
: 71411280 €,71 411 280,00 €
Amount spent
: 12516511 €,12 516 511,00 €
Percentage of investment
: 2,76 %2,76 %
Municipality
Maia
:Approved amount
: 209380289 €,209 380 289,00 €
Amount spent
: 46797055 €,46 797 055,00 €
Percentage of investment
: 8,1 %8,10 %
Municipality
Matosinhos
:Approved amount
: 459661941 €,459 661 941,00 €
Amount spent
: 133037398 €,133 037 398,00 €
Percentage of investment
: 17,77 %17,77 %
Municipality
Paredes
:Approved amount
: 43208103 €,43 208 103,00 €
Amount spent
: 13624521 €,13 624 521,00 €
Percentage of investment
: 1,67 %1,67 %
Municipality
Porto
:Approved amount
: 849527137 €,849 527 137,00 €
Amount spent
: 209091661 €,209 091 661,00 €
Percentage of investment
: 32,85 %32,85 %
Municipality
Póvoa de Varzim
:Approved amount
: 57323297 €,57 323 297,00 €
Amount spent
: 15740371 €,15 740 371,00 €
Percentage of investment
: 2,22 %2,22 %
Municipality
Santo Tirso
:Approved amount
: 57072970 €,57 072 970,00 €
Amount spent
: 10827833 €,10 827 833,00 €
Percentage of investment
: 2,21 %2,21 %
Municipality
Valongo
:Approved amount
: 43854112 €,43 854 112,00 €
Amount spent
: 6526098 €,6 526 098,00 €
Percentage of investment
: 1,7 %1,70 %
Municipality
Vila do Conde
:Approved amount
: 64566534 €,64 566 534,00 €
Amount spent
: 20792561 €,20 792 561,00 €
Percentage of investment
: 2,5 %2,50 %
Municipality
Vila Nova de Gaia
:Approved amount
: 416412125 €,416 412 125,00 €
Amount spent
: 76394535 €,76 394 535,00 €
Percentage of investment
: 16,1 %16,10 %
Municipality
Trofa
:Approved amount
: 57561038 €,57 561 038,00 €
Amount spent
: 16817053 €,16 817 053,00 €
Percentage of investment
: 2,23 %2,23 %
Total
Approved amount
: 2586443723 €,2 586 443 723,00 €
Amount spent
: 618436089 €,618 436 089,00 €
Percentage of investment
Sub-region
Alto Tâmega
:Municipality
Boticas
:Approved amount
: 2352915 €,2 352 915,00 €
Amount spent
: 686649 €,686 649,00 €
Percentage of investment
: 4,08 %4,08 %
Municipality
Chaves
:Approved amount
: 34581015 €,34 581 015,00 €
Amount spent
: 7054870 €,7 054 870,00 €
Percentage of investment
: 60,03 %60,03 %
Municipality
Montalegre
:Approved amount
: 1652344 €,1 652 344,00 €
Amount spent
: 1009195 €,1 009 195,00 €
Percentage of investment
: 2,87 %2,87 %
Municipality
Ribeira de Pena
:Approved amount
: 8968645 €,8 968 645,00 €
Amount spent
: 1953485 €,1 953 485,00 €
Percentage of investment
: 15,57 %15,57 %
Municipality
Valpaços
:Approved amount
: 2521076 €,2 521 076,00 €
Amount spent
: 1243300 €,1 243 300,00 €
Percentage of investment
: 4,38 %4,38 %
Municipality
Vila Pouca de Aguiar
:Approved amount
: 7527972 €,7 527 972,00 €
Amount spent
: 1921059 €,1 921 059,00 €
Percentage of investment
: 13,07 %13,07 %
Total
Approved amount
: 57603966 €,57 603 966,00 €
Amount spent
: 13868558 €,13 868 558,00 €
Percentage of investment
Sub-region
Tâmega e Sousa
:Municipality
Castelo de Paiva
:Approved amount
: 12347953 €,12 347 953,00 €
Amount spent
: 3942054 €,3 942 054,00 €
Percentage of investment
: 3,52 %3,52 %
Municipality
Celorico de Basto
:Approved amount
: 20002071 €,20 002 071,00 €
Amount spent
: 5099507 €,5 099 507,00 €
Percentage of investment
: 5,71 %5,71 %
Municipality
Amarante
:Approved amount
: 14033850 €,14 033 850,00 €
Amount spent
: 4579983 €,4 579 983,00 €
Percentage of investment
: 4 %4,00 %
Municipality
Baião
:Approved amount
: 43792585 €,43 792 585,00 €
Amount spent
: 11971029 €,11 971 029,00 €
Percentage of investment
: 12,49 %12,49 %
Municipality
Felgueiras
:Approved amount
: 40377793 €,40 377 793,00 €
Amount spent
: 12817214 €,12 817 214,00 €
Percentage of investment
: 11,52 %11,52 %
Municipality
Lousada
:Approved amount
: 38639459 €,38 639 459,00 €
Amount spent
: 12658725 €,12 658 725,00 €
Percentage of investment
: 11,02 %11,02 %
Municipality
Marco de Canaveses
:Approved amount
: 18283592 €,18 283 592,00 €
Amount spent
: 5757334 €,5 757 334,00 €
Percentage of investment
: 5,22 %5,22 %
Municipality
Paços de Ferreira
:Approved amount
: 60128580 €,60 128 580,00 €
Amount spent
: 11768229 €,11 768 229,00 €
Percentage of investment
: 17,15 %17,15 %
Municipality
Penafiel
:Approved amount
: 92938455 €,92 938 455,00 €
Amount spent
: 26846001 €,26 846 001,00 €
Percentage of investment
: 26,51 %26,51 %
Municipality
Cinfães
:Approved amount
: 7696275 €,7 696 275,00 €
Amount spent
: 1455538 €,1 455 538,00 €
Percentage of investment
: 2,2 %2,20 %
Municipality
Resende
:Approved amount
: 2322026 €,2 322 026,00 €
Amount spent
: 1234464 €,1 234 464,00 €
Percentage of investment
: 0,66 %0,66 %
Total
Approved amount
: 350562642 €,350 562 642,00 €
Amount spent
: 98130079 €,98 130 079,00 €
Percentage of investment
Sub-region
Douro
:Municipality
Carrazeda de Ansiães
:Approved amount
: 2019541 €,2 019 541,00 €
Amount spent
: 336644 €,336 644,00 €
Percentage of investment
: 0,99 %0,99 %
Municipality
Freixo de Espada à Cinta
:Approved amount
: 1852496 €,1 852 496,00 €
Amount spent
: 231416 €,231 416,00 €
Percentage of investment
: 0,91 %0,91 %
Municipality
Torre de Moncorvo
:Approved amount
: 2770421 €,2 770 421,00 €
Amount spent
: 1098028 €,1 098 028,00 €
Percentage of investment
: 1,36 %1,36 %
Municipality
Vila Nova de Foz Côa
:Approved amount
: 2560690 €,2 560 690,00 €
Amount spent
: 496548 €,496 548,00 €
Percentage of investment
: 1,26 %1,26 %
Municipality
Alijó
:Approved amount
: 9773884 €,9 773 884,00 €
Amount spent
: 2300137 €,2 300 137,00 €
Percentage of investment
: 4,81 %4,81 %
Municipality
Mesão Frio
:Approved amount
: 409960 €,409 960,00 €
Amount spent
: 196001 €,196 001,00 €
Percentage of investment
: 0,2 %0,20 %
Municipality
Murça
:Approved amount
: 1915286 €,1 915 286,00 €
Amount spent
: 581557 €,581 557,00 €
Percentage of investment
: 0,94 %0,94 %
Municipality
Peso da Régua
:Approved amount
: 15299481 €,15 299 481,00 €
Amount spent
: 3254133 €,3 254 133,00 €
Percentage of investment
: 7,53 %7,53 %
Municipality
Sabrosa
:Approved amount
: 1087763 €,1 087 763,00 €
Amount spent
: 405566 €,405 566,00 €
Percentage of investment
: 0,54 %0,54 %
Municipality
Santa Marta de Penaguião
:Approved amount
: 7672265 €,7 672 265,00 €
Amount spent
: 823056 €,823 056,00 €
Percentage of investment
: 3,78 %3,78 %
Municipality
Vila Real
:Approved amount
: 128142398 €,128 142 398,00 €
Amount spent
: 30006573 €,30 006 573,00 €
Percentage of investment
: 63,11 %63,11 %
Municipality
Armamar
:Approved amount
: 2722375 €,2 722 375,00 €
Amount spent
: 418516 €,418 516,00 €
Percentage of investment
: 1,34 %1,34 %
Municipality
Lamego
:Approved amount
: 9886183 €,9 886 183,00 €
Amount spent
: 2626307 €,2 626 307,00 €
Percentage of investment
: 4,87 %4,87 %
Municipality
Moimenta da Beira
:Approved amount
: 4454978 €,4 454 978,00 €
Amount spent
: 1172211 €,1 172 211,00 €
Percentage of investment
: 2,19 %2,19 %
Municipality
Penedono
:Approved amount
: 690259 €,690 259,00 €
Amount spent
: 231913 €,231 913,00 €
Percentage of investment
: 0,34 %0,34 %
Municipality
São João da Pesqueira
:Approved amount
: 6222505 €,6 222 505,00 €
Amount spent
: 1687886 €,1 687 886,00 €
Percentage of investment
: 3,06 %3,06 %
Municipality
Sernancelhe
:Approved amount
: 2139421 €,2 139 421,00 €
Amount spent
: 666802 €,666 802,00 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Tabuaço
:Approved amount
: 1404172 €,1 404 172,00 €
Amount spent
: 473847 €,473 847,00 €
Percentage of investment
: 0,69 %0,69 %
Municipality
Tarouca
:Approved amount
: 2023078 €,2 023 078,00 €
Amount spent
: 995334 €,995 334,00 €
Percentage of investment
: 1 %1,00 %
Total
Approved amount
: 203047157 €,203 047 157,00 €
Amount spent
: 48002476 €,48 002 476,00 €
Percentage of investment
Sub-region
Terras de Trás-os-Montes
:Municipality
Alfândega da Fé
:Approved amount
: 6957922 €,6 957 922,00 €
Amount spent
: 2023593 €,2 023 593,00 €
Percentage of investment
: 4,99 %4,99 %
Municipality
Bragança
:Approved amount
: 67589142 €,67 589 142,00 €
Amount spent
: 16731885 €,16 731 885,00 €
Percentage of investment
: 48,45 %48,45 %
Municipality
Macedo de Cavaleiros
:Approved amount
: 6569495 €,6 569 495,00 €
Amount spent
: 1836681 €,1 836 681,00 €
Percentage of investment
: 4,71 %4,71 %
Municipality
Miranda do Douro
:Approved amount
: 1752652 €,1 752 652,00 €
Amount spent
: 653719 €,653 719,00 €
Percentage of investment
: 1,26 %1,26 %
Municipality
Mirandela
:Approved amount
: 16084210 €,16 084 210,00 €
Amount spent
: 5767306 €,5 767 306,00 €
Percentage of investment
: 11,53 %11,53 %
Municipality
Mogadouro
:Approved amount
: 2103707 €,2 103 707,00 €
Amount spent
: 1295247 €,1 295 247,00 €
Percentage of investment
: 1,51 %1,51 %
Municipality
Vila Flor
:Approved amount
: 792249 €,792 249,00 €
Amount spent
: 473891 €,473 891,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Vimioso
:Approved amount
: 1627255 €,1 627 255,00 €
Amount spent
: 383305 €,383 305,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Vinhais
:Approved amount
: 36028222 €,36 028 222,00 €
Amount spent
: 4484170 €,4 484 170,00 €
Percentage of investment
: 25,83 %25,83 %
Total
Approved amount
: 139504855 €,139 504 855,00 €
Amount spent
: 33649798 €,33 649 798,00 €
Percentage of investment
Region
Center
:Sub-region
Oeste
:Municipality
Alcobaça
:Approved amount
: 31451408 €,31 451 408,00 €
Amount spent
: 7636203 €,7 636 203,00 €
Percentage of investment
: 14,7 %14,70 %
Municipality
Bombarral
:Approved amount
: 4509169 €,4 509 169,00 €
Amount spent
: 1237264 €,1 237 264,00 €
Percentage of investment
: 2,11 %2,11 %
Municipality
Caldas da Rainha
:Approved amount
: 41404097 €,41 404 097,00 €
Amount spent
: 10805103 €,10 805 103,00 €
Percentage of investment
: 19,35 %19,35 %
Municipality
Nazaré
:Approved amount
: 20982098 €,20 982 098,00 €
Amount spent
: 3502478 €,3 502 478,00 €
Percentage of investment
: 9,81 %9,81 %
Municipality
Óbidos
:Approved amount
: 6626820 €,6 626 820,00 €
Amount spent
: 1553331 €,1 553 331,00 €
Percentage of investment
: 3,1 %3,10 %
Municipality
Peniche
:Approved amount
: 23166075 €,23 166 075,00 €
Amount spent
: 5158176 €,5 158 176,00 €
Percentage of investment
: 10,83 %10,83 %
Municipality
Alenquer
:Approved amount
: 24612598 €,24 612 598,00 €
Amount spent
: 4095239 €,4 095 239,00 €
Percentage of investment
: 11,5 %11,50 %
Municipality
Arruda dos Vinhos
:Approved amount
: 17755265 €,17 755 265,00 €
Amount spent
: 4694245 €,4 694 245,00 €
Percentage of investment
: 8,3 %8,30 %
Municipality
Cadaval
:Approved amount
: 2722319 €,2 722 319,00 €
Amount spent
: 1140555 €,1 140 555,00 €
Percentage of investment
: 1,27 %1,27 %
Municipality
Lourinhã
:Approved amount
: 4261367 €,4 261 367,00 €
Amount spent
: 1721672 €,1 721 672,00 €
Percentage of investment
: 1,99 %1,99 %
Municipality
Sobral de Monte Agraço
:Approved amount
: 1002485 €,1 002 485,00 €
Amount spent
: 547946 €,547 946,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Torres Vedras
:Approved amount
: 35459133 €,35 459 133,00 €
Amount spent
: 8187125 €,8 187 125,00 €
Percentage of investment
: 16,57 %16,57 %
Total
Approved amount
: 213952835 €,213 952 835,00 €
Amount spent
: 50279337 €,50 279 337,00 €
Percentage of investment
Sub-region
Região de Aveiro
:Municipality
Águeda
:Approved amount
: 152058617 €,152 058 617,00 €
Amount spent
: 34816123 €,34 816 123,00 €
Percentage of investment
: 20,83 %20,83 %
Municipality
Albergaria-a-Velha
:Approved amount
: 16631925 €,16 631 925,00 €
Amount spent
: 4681613 €,4 681 613,00 €
Percentage of investment
: 2,28 %2,28 %
Municipality
Anadia
:Approved amount
: 22951240 €,22 951 240,00 €
Amount spent
: 7002721 €,7 002 721,00 €
Percentage of investment
: 3,14 %3,14 %
Municipality
Aveiro
:Approved amount
: 233777292 €,233 777 292,00 €
Amount spent
: 60195936 €,60 195 936,00 €
Percentage of investment
: 32,03 %32,03 %
Municipality
Estarreja
:Approved amount
: 134765260 €,134 765 260,00 €
Amount spent
: 21814968 €,21 814 968,00 €
Percentage of investment
: 18,46 %18,46 %
Municipality
Ílhavo
:Approved amount
: 85582985 €,85 582 985,00 €
Amount spent
: 22114011 €,22 114 011,00 €
Percentage of investment
: 11,72 %11,72 %
Municipality
Murtosa
:Approved amount
: 10571832 €,10 571 832,00 €
Amount spent
: 9934189 €,9 934 189,00 €
Percentage of investment
: 1,45 %1,45 %
Municipality
Oliveira do Bairro
:Approved amount
: 21705906 €,21 705 906,00 €
Amount spent
: 5073245 €,5 073 245,00 €
Percentage of investment
: 2,97 %2,97 %
Municipality
Ovar
:Approved amount
: 35666773 €,35 666 773,00 €
Amount spent
: 8636720 €,8 636 720,00 €
Percentage of investment
: 4,89 %4,89 %
Municipality
Sever do Vouga
:Approved amount
: 5650132 €,5 650 132,00 €
Amount spent
: 2069880 €,2 069 880,00 €
Percentage of investment
: 0,77 %0,77 %
Municipality
Vagos
:Approved amount
: 10580106 €,10 580 106,00 €
Amount spent
: 3198099 €,3 198 099,00 €
Percentage of investment
: 1,45 %1,45 %
Total
Approved amount
: 729942068 €,729 942 068,00 €
Amount spent
: 179537506 €,179 537 506,00 €
Percentage of investment
Sub-region
Região de Coimbra
:Municipality
Mealhada
:Approved amount
: 1597155 €,1 597 155,00 €
Amount spent
: 911054 €,911 054,00 €
Percentage of investment
: 0,29 %0,29 %
Municipality
Arganil
:Approved amount
: 7082911 €,7 082 911,00 €
Amount spent
: 2275327 €,2 275 327,00 €
Percentage of investment
: 1,3 %1,30 %
Municipality
Cantanhede
:Approved amount
: 25137550 €,25 137 550,00 €
Amount spent
: 7699253 €,7 699 253,00 €
Percentage of investment
: 4,62 %4,62 %
Municipality
Coimbra
:Approved amount
: 318592215 €,318 592 215,00 €
Amount spent
: 82461958 €,82 461 958,00 €
Percentage of investment
: 58,59 %58,59 %
Municipality
Condeixa-a-Nova
:Approved amount
: 9013089 €,9 013 089,00 €
Amount spent
: 1424400 €,1 424 400,00 €
Percentage of investment
: 1,66 %1,66 %
Municipality
Figueira da Foz
:Approved amount
: 93918421 €,93 918 421,00 €
Amount spent
: 21934816 €,21 934 816,00 €
Percentage of investment
: 17,27 %17,27 %
Municipality
Góis
:Approved amount
: 1613053 €,1 613 053,00 €
Amount spent
: 414742 €,414 742,00 €
Percentage of investment
: 0,3 %0,30 %
Municipality
Lousã
:Approved amount
: 5371826 €,5 371 826,00 €
Amount spent
: 1382056 €,1 382 056,00 €
Percentage of investment
: 0,99 %0,99 %
Municipality
Mira
:Approved amount
: 6189071 €,6 189 071,00 €
Amount spent
: 2616739 €,2 616 739,00 €
Percentage of investment
: 1,14 %1,14 %
Municipality
Miranda do Corvo
:Approved amount
: 2618407 €,2 618 407,00 €
Amount spent
: 929705 €,929 705,00 €
Percentage of investment
: 0,48 %0,48 %
Municipality
Montemor-o-Velho
:Approved amount
: 5168709 €,5 168 709,00 €
Amount spent
: 1647984 €,1 647 984,00 €
Percentage of investment
: 0,95 %0,95 %
Municipality
Oliveira do Hospital
:Approved amount
: 35163122 €,35 163 122,00 €
Amount spent
: 8422621 €,8 422 621,00 €
Percentage of investment
: 6,47 %6,47 %
Municipality
Pampilhosa da Serra
:Approved amount
: 9442854 €,9 442 854,00 €
Amount spent
: 2619572 €,2 619 572,00 €
Percentage of investment
: 1,74 %1,74 %
Municipality
Penacova
:Approved amount
: 6421217 €,6 421 217,00 €
Amount spent
: 2058675 €,2 058 675,00 €
Percentage of investment
: 1,18 %1,18 %
Municipality
Penela
:Approved amount
: 882016 €,882 016,00 €
Amount spent
: 444856 €,444 856,00 €
Percentage of investment
: 0,16 %0,16 %
Municipality
Soure
:Approved amount
: 2304264 €,2 304 264,00 €
Amount spent
: 1054596 €,1 054 596,00 €
Percentage of investment
: 0,42 %0,42 %
Municipality
Tábua
:Approved amount
: 6328769 €,6 328 769,00 €
Amount spent
: 1634839 €,1 634 839,00 €
Percentage of investment
: 1,16 %1,16 %
Municipality
Vila Nova de Poiares
:Approved amount
: 2582828 €,2 582 828,00 €
Amount spent
: 746047 €,746 047,00 €
Percentage of investment
: 0,47 %0,47 %
Municipality
Mortágua
:Approved amount
: 4366150 €,4 366 150,00 €
Amount spent
: 1340001 €,1 340 001,00 €
Percentage of investment
: 0,8 %0,80 %
Total
Approved amount
: 543793629 €,543 793 629,00 €
Amount spent
: 142019240 €,142 019 240,00 €
Percentage of investment
Sub-region
Região de Leiria
:Municipality
Alvaiázere
:Approved amount
: 1570584 €,1 570 584,00 €
Amount spent
: 501169 €,501 169,00 €
Percentage of investment
: 0,46 %0,46 %
Municipality
Ansião
:Approved amount
: 5802993 €,5 802 993,00 €
Amount spent
: 1666640 €,1 666 640,00 €
Percentage of investment
: 1,71 %1,71 %
Municipality
Batalha
:Approved amount
: 22195780 €,22 195 780,00 €
Amount spent
: 5992258 €,5 992 258,00 €
Percentage of investment
: 6,52 %6,52 %
Municipality
Castanheira de Pêra
:Approved amount
: 3259763 €,3 259 763,00 €
Amount spent
: 410743 €,410 743,00 €
Percentage of investment
: 0,96 %0,96 %
Municipality
Figueiró dos Vinhos
:Approved amount
: 1950603 €,1 950 603,00 €
Amount spent
: 633960 €,633 960,00 €
Percentage of investment
: 0,57 %0,57 %
Municipality
Leiria
:Approved amount
: 149354124 €,149 354 124,00 €
Amount spent
: 53053484 €,53 053 484,00 €
Percentage of investment
: 43,9 %43,90 %
Municipality
Marinha Grande
:Approved amount
: 94510644 €,94 510 644,00 €
Amount spent
: 22987074 €,22 987 074,00 €
Percentage of investment
: 27,78 %27,78 %
Municipality
Pedrógão Grande
:Approved amount
: 2724165 €,2 724 165,00 €
Amount spent
: 700648 €,700 648,00 €
Percentage of investment
: 0,8 %0,80 %
Municipality
Pombal
:Approved amount
: 41142497 €,41 142 497,00 €
Amount spent
: 11025423 €,11 025 423,00 €
Percentage of investment
: 12,09 %12,09 %
Municipality
Porto de Mós
:Approved amount
: 17702555 €,17 702 555,00 €
Amount spent
: 5414004 €,5 414 004,00 €
Percentage of investment
: 5,2 %5,20 %
Total
Approved amount
: 340213710 €,340 213 710,00 €
Amount spent
: 102385403 €,102 385 403,00 €
Percentage of investment
Sub-region
Viseu Dão Lafões
:Municipality
Aguiar da Beira
:Approved amount
: 2606671 €,2 606 671,00 €
Amount spent
: 687431 €,687 431,00 €
Percentage of investment
: 1,02 %1,02 %
Municipality
Carregal do Sal
:Approved amount
: 6141710 €,6 141 710,00 €
Amount spent
: 1176331 €,1 176 331,00 €
Percentage of investment
: 2,41 %2,41 %
Municipality
Castro Daire
:Approved amount
: 4627588 €,4 627 588,00 €
Amount spent
: 1777492 €,1 777 492,00 €
Percentage of investment
: 1,81 %1,81 %
Municipality
Mangualde
:Approved amount
: 80092333 €,80 092 333,00 €
Amount spent
: 23056975 €,23 056 975,00 €
Percentage of investment
: 31,38 %31,38 %
Municipality
Nelas
:Approved amount
: 8223418 €,8 223 418,00 €
Amount spent
: 2283107 €,2 283 107,00 €
Percentage of investment
: 3,22 %3,22 %
Municipality
Oliveira de Frades
:Approved amount
: 15680883 €,15 680 883,00 €
Amount spent
: 4069840 €,4 069 840,00 €
Percentage of investment
: 6,14 %6,14 %
Municipality
Penalva do Castelo
:Approved amount
: 5302541 €,5 302 541,00 €
Amount spent
: 1048214 €,1 048 214,00 €
Percentage of investment
: 2,08 %2,08 %
Municipality
Santa Comba Dão
:Approved amount
: 1593820 €,1 593 820,00 €
Amount spent
: 625820 €,625 820,00 €
Percentage of investment
: 0,62 %0,62 %
Municipality
São Pedro do Sul
:Approved amount
: 7675084 €,7 675 084,00 €
Amount spent
: 2417983 €,2 417 983,00 €
Percentage of investment
: 3,01 %3,01 %
Municipality
Sátão
:Approved amount
: 2864424 €,2 864 424,00 €
Amount spent
: 990740 €,990 740,00 €
Percentage of investment
: 1,12 %1,12 %
Municipality
Tondela
:Approved amount
: 24658005 €,24 658 005,00 €
Amount spent
: 6567593 €,6 567 593,00 €
Percentage of investment
: 9,66 %9,66 %
Municipality
Vila Nova de Paiva
:Approved amount
: 2156706 €,2 156 706,00 €
Amount spent
: 404468 €,404 468,00 €
Percentage of investment
: 0,84 %0,84 %
Municipality
Viseu
:Approved amount
: 89188418 €,89 188 418,00 €
Amount spent
: 28108144 €,28 108 144,00 €
Percentage of investment
: 34,94 %34,94 %
Municipality
Vouzela
:Approved amount
: 4427905 €,4 427 905,00 €
Amount spent
: 1273928 €,1 273 928,00 €
Percentage of investment
: 1,73 %1,73 %
Total
Approved amount
: 255239508 €,255 239 508,00 €
Amount spent
: 74488064 €,74 488 064,00 €
Percentage of investment
Sub-region
Beira Baixa
:Municipality
Castelo Branco
:Approved amount
: 44109363 €,44 109 363,00 €
Amount spent
: 9947771 €,9 947 771,00 €
Percentage of investment
: 45,26 %45,26 %
Municipality
Idanha-a-Nova
:Approved amount
: 7660521 €,7 660 521,00 €
Amount spent
: 2140437 €,2 140 437,00 €
Percentage of investment
: 7,86 %7,86 %
Municipality
Oleiros
:Approved amount
: 14187230 €,14 187 230,00 €
Amount spent
: 3349263 €,3 349 263,00 €
Percentage of investment
: 14,56 %14,56 %
Municipality
Penamacor
:Approved amount
: 1076973 €,1 076 973,00 €
Amount spent
: 313254 €,313 254,00 €
Percentage of investment
: 1,11 %1,11 %
Municipality
Proença-a-Nova
:Approved amount
: 1965386 €,1 965 386,00 €
Amount spent
: 843326 €,843 326,00 €
Percentage of investment
: 2,02 %2,02 %
Municipality
Vila Velha de Ródão
:Approved amount
: 28451495 €,28 451 495,00 €
Amount spent
: 2742422 €,2 742 422,00 €
Percentage of investment
: 29,2 %29,20 %
Total
Approved amount
: 97450969 €,97 450 969,00 €
Amount spent
: 19336472 €,19 336 472,00 €
Percentage of investment
Sub-region
Médio Tejo
:Municipality
Sertã
:Approved amount
: 5493308 €,5 493 308,00 €
Amount spent
: 1682559 €,1 682 559,00 €
Percentage of investment
: 2,55 %2,55 %
Municipality
Vila de Rei
:Approved amount
: 2968213 €,2 968 213,00 €
Amount spent
: 1498855 €,1 498 855,00 €
Percentage of investment
: 1,38 %1,38 %
Municipality
Abrantes
:Approved amount
: 15752325 €,15 752 325,00 €
Amount spent
: 7778970 €,7 778 970,00 €
Percentage of investment
: 7,31 %7,31 %
Municipality
Alcanena
:Approved amount
: 27824888 €,27 824 888,00 €
Amount spent
: 4416584 €,4 416 584,00 €
Percentage of investment
: 12,92 %12,92 %
Municipality
Constância
:Approved amount
: 33568452 €,33 568 452,00 €
Amount spent
: 8522229 €,8 522 229,00 €
Percentage of investment
: 15,59 %15,59 %
Municipality
Entroncamento
:Approved amount
: 27896472 €,27 896 472,00 €
Amount spent
: 5164878 €,5 164 878,00 €
Percentage of investment
: 12,95 %12,95 %
Municipality
Ferreira do Zêzere
:Approved amount
: 14508134 €,14 508 134,00 €
Amount spent
: 549472 €,549 472,00 €
Percentage of investment
: 6,74 %6,74 %
Municipality
Mação
:Approved amount
: 1781017 €,1 781 017,00 €
Amount spent
: 907965 €,907 965,00 €
Percentage of investment
: 0,83 %0,83 %
Municipality
Sardoal
:Approved amount
: 2269934 €,2 269 934,00 €
Amount spent
: 629511 €,629 511,00 €
Percentage of investment
: 1,05 %1,05 %
Municipality
Tomar
:Approved amount
: 31589920 €,31 589 920,00 €
Amount spent
: 6786896 €,6 786 896,00 €
Percentage of investment
: 14,67 %14,67 %
Municipality
Torres Novas
:Approved amount
: 25046690 €,25 046 690,00 €
Amount spent
: 6472460 €,6 472 460,00 €
Percentage of investment
: 11,63 %11,63 %
Municipality
Vila Nova da Barquinha
:Approved amount
: 3084374 €,3 084 374,00 €
Amount spent
: 1092090 €,1 092 090,00 €
Percentage of investment
: 1,43 %1,43 %
Municipality
Ourém
:Approved amount
: 23604157 €,23 604 157,00 €
Amount spent
: 7430870 €,7 430 870,00 €
Percentage of investment
: 10,96 %10,96 %
Total
Approved amount
: 215387884 €,215 387 884,00 €
Amount spent
: 52933337 €,52 933 337,00 €
Percentage of investment
Sub-region
Beiras e Serra da Estrela
:Municipality
Belmonte
:Approved amount
: 1876323 €,1 876 323,00 €
Amount spent
: 370645 €,370 645,00 €
Percentage of investment
: 0,97 %0,97 %
Municipality
Covilhã
:Approved amount
: 59625605 €,59 625 605,00 €
Amount spent
: 15389804 €,15 389 804,00 €
Percentage of investment
: 30,71 %30,71 %
Municipality
Fundão
:Approved amount
: 38324108 €,38 324 108,00 €
Amount spent
: 10053233 €,10 053 233,00 €
Percentage of investment
: 19,74 %19,74 %
Municipality
Almeida
:Approved amount
: 4377408 €,4 377 408,00 €
Amount spent
: 766477 €,766 477,00 €
Percentage of investment
: 2,25 %2,25 %
Municipality
Celorico da Beira
:Approved amount
: 4611954 €,4 611 954,00 €
Amount spent
: 630129 €,630 129,00 €
Percentage of investment
: 2,38 %2,38 %
Municipality
Figueira de Castelo Rodrigo
:Approved amount
: 939564 €,939 564,00 €
Amount spent
: 465153 €,465 153,00 €
Percentage of investment
: 0,48 %0,48 %
Municipality
Fornos de Algodres
:Approved amount
: 3920595 €,3 920 595,00 €
Amount spent
: 998442 €,998 442,00 €
Percentage of investment
: 2,02 %2,02 %
Municipality
Gouveia
:Approved amount
: 3847799 €,3 847 799,00 €
Amount spent
: 1183200 €,1 183 200,00 €
Percentage of investment
: 1,98 %1,98 %
Municipality
Guarda
:Approved amount
: 46060121 €,46 060 121,00 €
Amount spent
: 9561622 €,9 561 622,00 €
Percentage of investment
: 23,72 %23,72 %
Municipality
Manteigas
:Approved amount
: 988101 €,988 101,00 €
Amount spent
: 274740 €,274 740,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Mêda
:Approved amount
: 792257 €,792 257,00 €
Amount spent
: 437765 €,437 765,00 €
Percentage of investment
: 0,41 %0,41 %
Municipality
Pinhel
:Approved amount
: 2607807 €,2 607 807,00 €
Amount spent
: 720295 €,720 295,00 €
Percentage of investment
: 1,34 %1,34 %
Municipality
Sabugal
:Approved amount
: 2207919 €,2 207 919,00 €
Amount spent
: 848416 €,848 416,00 €
Percentage of investment
: 1,14 %1,14 %
Municipality
Seia
:Approved amount
: 20683246 €,20 683 246,00 €
Amount spent
: 4356487 €,4 356 487,00 €
Percentage of investment
: 10,65 %10,65 %
Municipality
Trancoso
:Approved amount
: 3298510 €,3 298 510,00 €
Amount spent
: 1035147 €,1 035 147,00 €
Percentage of investment
: 1,7 %1,70 %
Total
Approved amount
: 194161317 €,194 161 317,00 €
Amount spent
: 47091556 €,47 091 556,00 €
Percentage of investment
Region
Lisbon Metropolitan Area
:Sub-region
Lisbon Metropolitan Area
:Municipality
Cascais
:Approved amount
: 74352548 €,74 352 548,00 €
Amount spent
: 19394482 €,19 394 482,00 €
Percentage of investment
: 1,92 %1,92 %
Municipality
Lisboa
:Approved amount
: 2070637718 €,2 070 637 718,00 €
Amount spent
: 508346424 €,508 346 424,00 €
Percentage of investment
: 53,4 %53,40 %
Municipality
Loures
:Approved amount
: 306422750 €,306 422 750,00 €
Amount spent
: 31183475 €,31 183 475,00 €
Percentage of investment
: 7,9 %7,90 %
Municipality
Mafra
:Approved amount
: 87721366 €,87 721 366,00 €
Amount spent
: 9476640 €,9 476 640,00 €
Percentage of investment
: 2,26 %2,26 %
Municipality
Oeiras
:Approved amount
: 249502427 €,249 502 427,00 €
Amount spent
: 48399607 €,48 399 607,00 €
Percentage of investment
: 6,43 %6,43 %
Municipality
Sintra
:Approved amount
: 117304992 €,117 304 992,00 €
Amount spent
: 34572464 €,34 572 464,00 €
Percentage of investment
: 3,03 %3,03 %
Municipality
Vila Franca de Xira
:Approved amount
: 90796067 €,90 796 067,00 €
Amount spent
: 15199540 €,15 199 540,00 €
Percentage of investment
: 2,34 %2,34 %
Municipality
Amadora
:Approved amount
: 128894976 €,128 894 976,00 €
Amount spent
: 49088748 €,49 088 748,00 €
Percentage of investment
: 3,32 %3,32 %
Municipality
Odivelas
:Approved amount
: 223474176 €,223 474 176,00 €
Amount spent
: 25945103 €,25 945 103,00 €
Percentage of investment
: 5,76 %5,76 %
Municipality
Alcochete
:Approved amount
: 13016109 €,13 016 109,00 €
Amount spent
: 3143077 €,3 143 077,00 €
Percentage of investment
: 0,34 %0,34 %
Municipality
Almada
:Approved amount
: 68280695 €,68 280 695,00 €
Amount spent
: 16432866 €,16 432 866,00 €
Percentage of investment
: 1,76 %1,76 %
Municipality
Barreiro
:Approved amount
: 53835367 €,53 835 367,00 €
Amount spent
: 11132863 €,11 132 863,00 €
Percentage of investment
: 1,39 %1,39 %
Municipality
Moita
:Approved amount
: 20429091 €,20 429 091,00 €
Amount spent
: 4397753 €,4 397 753,00 €
Percentage of investment
: 0,53 %0,53 %
Municipality
Montijo
:Approved amount
: 23525451 €,23 525 451,00 €
Amount spent
: 4578539 €,4 578 539,00 €
Percentage of investment
: 0,61 %0,61 %
Municipality
Palmela
:Approved amount
: 47409747 €,47 409 747,00 €
Amount spent
: 8671570 €,8 671 570,00 €
Percentage of investment
: 1,22 %1,22 %
Municipality
Seixal
:Approved amount
: 83420912 €,83 420 912,00 €
Amount spent
: 27001580 €,27 001 580,00 €
Percentage of investment
: 2,15 %2,15 %
Municipality
Sesimbra
:Approved amount
: 11244829 €,11 244 829,00 €
Amount spent
: 3954457 €,3 954 457,00 €
Percentage of investment
: 0,29 %0,29 %
Municipality
Setúbal
:Approved amount
: 207188515 €,207 188 515,00 €
Amount spent
: 42146386 €,42 146 386,00 €
Percentage of investment
: 5,34 %5,34 %
Total
Approved amount
: 3877457735 €,3 877 457 735,00 €
Amount spent
: 863065575 €,863 065 575,00 €
Percentage of investment
Region
Alentejo
:Sub-region
Alentejo Litoral
:Municipality
Odemira
:Approved amount
: 6073399 €,6 073 399,00 €
Amount spent
: 1970296 €,1 970 296,00 €
Percentage of investment
: 3,78 %3,78 %
Municipality
Alcácer do Sal
:Approved amount
: 4035708 €,4 035 708,00 €
Amount spent
: 743204 €,743 204,00 €
Percentage of investment
: 2,51 %2,51 %
Municipality
Grândola
:Approved amount
: 52691160 €,52 691 160,00 €
Amount spent
: 14908447 €,14 908 447,00 €
Percentage of investment
: 32,82 %32,82 %
Municipality
Santiago do Cacém
:Approved amount
: 57810160 €,57 810 160,00 €
Amount spent
: 14585399 €,14 585 399,00 €
Percentage of investment
: 36,01 %36,01 %
Municipality
Sines
:Approved amount
: 39926741 €,39 926 741,00 €
Amount spent
: 9715097 €,9 715 097,00 €
Percentage of investment
: 24,87 %24,87 %
Total
Approved amount
: 160537168 €,160 537 168,00 €
Amount spent
: 41922444 €,41 922 444,00 €
Percentage of investment
Sub-region
Baixo Alentejo
:Municipality
Aljustrel
:Approved amount
: 38515123 €,38 515 123,00 €
Amount spent
: 8787281 €,8 787 281,00 €
Percentage of investment
: 15,49 %15,49 %
Municipality
Almodôvar
:Approved amount
: 937360 €,937 360,00 €
Amount spent
: 535042 €,535 042,00 €
Percentage of investment
: 0,38 %0,38 %
Municipality
Alvito
:Approved amount
: 2897445 €,2 897 445,00 €
Amount spent
: 474867 €,474 867,00 €
Percentage of investment
: 1,17 %1,17 %
Municipality
Barrancos
:Approved amount
: 1129464 €,1 129 464,00 €
Amount spent
: 106169 €,106 169,00 €
Percentage of investment
: 0,45 %0,45 %
Municipality
Beja
:Approved amount
: 73648654 €,73 648 654,00 €
Amount spent
: 16115371 €,16 115 371,00 €
Percentage of investment
: 29,62 %29,62 %
Municipality
Castro Verde
:Approved amount
: 30949442 €,30 949 442,00 €
Amount spent
: 455564 €,455 564,00 €
Percentage of investment
: 12,45 %12,45 %
Municipality
Cuba
:Approved amount
: 952057 €,952 057,00 €
Amount spent
: 325311 €,325 311,00 €
Percentage of investment
: 0,38 %0,38 %
Municipality
Ferreira do Alentejo
:Approved amount
: 24199578 €,24 199 578,00 €
Amount spent
: 6941950 €,6 941 950,00 €
Percentage of investment
: 9,73 %9,73 %
Municipality
Mértola
:Approved amount
: 67663261 €,67 663 261,00 €
Amount spent
: 7046457 €,7 046 457,00 €
Percentage of investment
: 27,21 %27,21 %
Municipality
Moura
:Approved amount
: 2049635 €,2 049 635,00 €
Amount spent
: 856142 €,856 142,00 €
Percentage of investment
: 0,82 %0,82 %
Municipality
Ourique
:Approved amount
: 2337906 €,2 337 906,00 €
Amount spent
: 494140 €,494 140,00 €
Percentage of investment
: 0,94 %0,94 %
Municipality
Serpa
:Approved amount
: 1499249 €,1 499 249,00 €
Amount spent
: 618144 €,618 144,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Vidigueira
:Approved amount
: 1846031 €,1 846 031,00 €
Amount spent
: 615828 €,615 828,00 €
Percentage of investment
: 0,74 %0,74 %
Total
Approved amount
: 248625205 €,248 625 205,00 €
Amount spent
: 43372267 €,43 372 267,00 €
Percentage of investment
Sub-region
Lezíria do Tejo
:Municipality
Azambuja
:Approved amount
: 11048104 €,11 048 104,00 €
Amount spent
: 3625731 €,3 625 731,00 €
Percentage of investment
: 6,56 %6,56 %
Municipality
Almeirim
:Approved amount
: 1726321 €,1 726 321,00 €
Amount spent
: 659140 €,659 140,00 €
Percentage of investment
: 1,03 %1,03 %
Municipality
Alpiarça
:Approved amount
: 2250555 €,2 250 555,00 €
Amount spent
: 790639 €,790 639,00 €
Percentage of investment
: 1,34 %1,34 %
Municipality
Benavente
:Approved amount
: 31884710 €,31 884 710,00 €
Amount spent
: 7085538 €,7 085 538,00 €
Percentage of investment
: 18,94 %18,94 %
Municipality
Cartaxo
:Approved amount
: 6963289 €,6 963 289,00 €
Amount spent
: 1326205 €,1 326 205,00 €
Percentage of investment
: 4,14 %4,14 %
Municipality
Chamusca
:Approved amount
: 6434919 €,6 434 919,00 €
Amount spent
: 894447 €,894 447,00 €
Percentage of investment
: 3,82 %3,82 %
Municipality
Coruche
:Approved amount
: 4182071 €,4 182 071,00 €
Amount spent
: 2279433 €,2 279 433,00 €
Percentage of investment
: 2,48 %2,48 %
Municipality
Golegã
:Approved amount
: 2754939 €,2 754 939,00 €
Amount spent
: 702341 €,702 341,00 €
Percentage of investment
: 1,64 %1,64 %
Municipality
Rio Maior
:Approved amount
: 30512724 €,30 512 724,00 €
Amount spent
: 4823651 €,4 823 651,00 €
Percentage of investment
: 18,12 %18,12 %
Municipality
Salvaterra de Magos
:Approved amount
: 4385860 €,4 385 860,00 €
Amount spent
: 830169 €,830 169,00 €
Percentage of investment
: 2,6 %2,60 %
Municipality
Santarém
:Approved amount
: 66235947 €,66 235 947,00 €
Amount spent
: 16240054 €,16 240 054,00 €
Percentage of investment
: 39,34 %39,34 %
Total
Approved amount
: 168379439 €,168 379 439,00 €
Amount spent
: 39257348 €,39 257 348,00 €
Percentage of investment
Sub-region
Alto Alentejo
:Municipality
Alter do Chão
:Approved amount
: 299546 €,299 546,00 €
Amount spent
: 166846 €,166 846,00 €
Percentage of investment
: 0,12 %0,12 %
Municipality
Arronches
:Approved amount
: 940452 €,940 452,00 €
Amount spent
: 123798 €,123 798,00 €
Percentage of investment
: 0,36 %0,36 %
Municipality
Avis
:Approved amount
: 627044 €,627 044,00 €
Amount spent
: 195966 €,195 966,00 €
Percentage of investment
: 0,24 %0,24 %
Municipality
Campo Maior
:Approved amount
: 20180147 €,20 180 147,00 €
Amount spent
: 3443417 €,3 443 417,00 €
Percentage of investment
: 7,82 %7,82 %
Municipality
Castelo de Vide
:Approved amount
: 476483 €,476 483,00 €
Amount spent
: 255261 €,255 261,00 €
Percentage of investment
: 0,18 %0,18 %
Municipality
Crato
:Approved amount
: 612472 €,612 472,00 €
Amount spent
: 281586 €,281 586,00 €
Percentage of investment
: 0,24 %0,24 %
Municipality
Elvas
:Approved amount
: 21582616 €,21 582 616,00 €
Amount spent
: 3251534 €,3 251 534,00 €
Percentage of investment
: 8,36 %8,36 %
Municipality
Fronteira
:Approved amount
: 330976 €,330 976,00 €
Amount spent
: 179528 €,179 528,00 €
Percentage of investment
: 0,13 %0,13 %
Municipality
Gavião
:Approved amount
: 787379 €,787 379,00 €
Amount spent
: 362555 €,362 555,00 €
Percentage of investment
: 0,3 %0,30 %
Municipality
Marvão
:Approved amount
: 1322941 €,1 322 941,00 €
Amount spent
: 209104 €,209 104,00 €
Percentage of investment
: 0,51 %0,51 %
Municipality
Monforte
:Approved amount
: 1155070 €,1 155 070,00 €
Amount spent
: 326906 €,326 906,00 €
Percentage of investment
: 0,45 %0,45 %
Municipality
Nisa
:Approved amount
: 11218125 €,11 218 125,00 €
Amount spent
: 993141 €,993 141,00 €
Percentage of investment
: 4,35 %4,35 %
Municipality
Ponte de Sôr
:Approved amount
: 13971383 €,13 971 383,00 €
Amount spent
: 3297489 €,3 297 489,00 €
Percentage of investment
: 5,41 %5,41 %
Municipality
Portalegre
:Approved amount
: 183825242 €,183 825 242,00 €
Amount spent
: 25481608 €,25 481 608,00 €
Percentage of investment
: 71,2 %71,20 %
Municipality
Sousel
:Approved amount
: 847731 €,847 731,00 €
Amount spent
: 321011 €,321 011,00 €
Percentage of investment
: 0,33 %0,33 %
Total
Approved amount
: 258177607 €,258 177 607,00 €
Amount spent
: 38889750 €,38 889 750,00 €
Percentage of investment
Sub-region
Alentejo Central
:Municipality
Alandroal
:Approved amount
: 2468207 €,2 468 207,00 €
Amount spent
: 570412 €,570 412,00 €
Percentage of investment
: 1,66 %1,66 %
Municipality
Arraiolos
:Approved amount
: 1967694 €,1 967 694,00 €
Amount spent
: 788419 €,788 419,00 €
Percentage of investment
: 1,33 %1,33 %
Municipality
Borba
:Approved amount
: 1308195 €,1 308 195,00 €
Amount spent
: 571761 €,571 761,00 €
Percentage of investment
: 0,88 %0,88 %
Municipality
Estremoz
:Approved amount
: 4407197 €,4 407 197,00 €
Amount spent
: 1776969 €,1 776 969,00 €
Percentage of investment
: 2,97 %2,97 %
Municipality
Évora
:Approved amount
: 111363416 €,111 363 416,00 €
Amount spent
: 28812475 €,28 812 475,00 €
Percentage of investment
: 75,1 %75,10 %
Municipality
Montemor-o-Novo
:Approved amount
: 7993404 €,7 993 404,00 €
Amount spent
: 889797 €,889 797,00 €
Percentage of investment
: 5,39 %5,39 %
Municipality
Mora
:Approved amount
: 1710287 €,1 710 287,00 €
Amount spent
: 504981 €,504 981,00 €
Percentage of investment
: 1,15 %1,15 %
Municipality
Mourão
:Approved amount
: 1058947 €,1 058 947,00 €
Amount spent
: 256316 €,256 316,00 €
Percentage of investment
: 0,71 %0,71 %
Municipality
Portel
:Approved amount
: 889586 €,889 586,00 €
Amount spent
: 370582 €,370 582,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Redondo
:Approved amount
: 1106578 €,1 106 578,00 €
Amount spent
: 357431 €,357 431,00 €
Percentage of investment
: 0,75 %0,75 %
Municipality
Reguengos de Monsaraz
:Approved amount
: 5486622 €,5 486 622,00 €
Amount spent
: 1754600 €,1 754 600,00 €
Percentage of investment
: 3,7 %3,70 %
Municipality
Vendas Novas
:Approved amount
: 3167154 €,3 167 154,00 €
Amount spent
: 1201751 €,1 201 751,00 €
Percentage of investment
: 2,14 %2,14 %
Municipality
Viana do Alentejo
:Approved amount
: 651326 €,651 326,00 €
Amount spent
: 309636 €,309 636,00 €
Percentage of investment
: 0,44 %0,44 %
Municipality
Vila Viçosa
:Approved amount
: 4699993 €,4 699 993,00 €
Amount spent
: 1126673 €,1 126 673,00 €
Percentage of investment
: 3,17 %3,17 %
Total
Approved amount
: 148278606 €,148 278 606,00 €
Amount spent
: 39291804 €,39 291 804,00 €
Percentage of investment
Region
Algarve
:Sub-region
Algarve
:Municipality
Albufeira
:Approved amount
: 70165608 €,70 165 608,00 €
Amount spent
: 12180006 €,12 180 006,00 €
Percentage of investment
: 17,11 %17,11 %
Municipality
Alcoutim
:Approved amount
: 12280743 €,12 280 743,00 €
Amount spent
: 1212831 €,1 212 831,00 €
Percentage of investment
: 2,99 %2,99 %
Municipality
Aljezur
:Approved amount
: 789262 €,789 262,00 €
Amount spent
: 363997 €,363 997,00 €
Percentage of investment
: 0,19 %0,19 %
Municipality
Castro Marim
:Approved amount
: 4751480 €,4 751 480,00 €
Amount spent
: 748998 €,748 998,00 €
Percentage of investment
: 1,16 %1,16 %
Municipality
Faro
:Approved amount
: 102279780 €,102 279 780,00 €
Amount spent
: 21918038 €,21 918 038,00 €
Percentage of investment
: 24,94 %24,94 %
Municipality
Lagoa
:Approved amount
: 12958895 €,12 958 895,00 €
Amount spent
: 1471715 €,1 471 715,00 €
Percentage of investment
: 3,16 %3,16 %
Municipality
Lagos
:Approved amount
: 17509547 €,17 509 547,00 €
Amount spent
: 1575964 €,1 575 964,00 €
Percentage of investment
: 4,27 %4,27 %
Municipality
Loulé
:Approved amount
: 39324900 €,39 324 900,00 €
Amount spent
: 11326093 €,11 326 093,00 €
Percentage of investment
: 9,59 %9,59 %
Municipality
Monchique
:Approved amount
: 9076996 €,9 076 996,00 €
Amount spent
: 129101 €,129 101,00 €
Percentage of investment
: 2,21 %2,21 %
Municipality
Olhão
:Approved amount
: 40883226 €,40 883 226,00 €
Amount spent
: 7192646 €,7 192 646,00 €
Percentage of investment
: 9,97 %9,97 %
Municipality
Portimão
:Approved amount
: 26237901 €,26 237 901,00 €
Amount spent
: 4755837 €,4 755 837,00 €
Percentage of investment
: 6,4 %6,40 %
Municipality
São Brás de Alportel
:Approved amount
: 1634901 €,1 634 901,00 €
Amount spent
: 551139 €,551 139,00 €
Percentage of investment
: 0,4 %0,40 %
Municipality
Silves
:Approved amount
: 27022194 €,27 022 194,00 €
Amount spent
: 3559647 €,3 559 647,00 €
Percentage of investment
: 6,59 %6,59 %
Municipality
Tavira
:Approved amount
: 16699296 €,16 699 296,00 €
Amount spent
: 2170182 €,2 170 182,00 €
Percentage of investment
: 4,07 %4,07 %
Municipality
Vila do Bispo
:Approved amount
: 3790337 €,3 790 337,00 €
Amount spent
: 466712 €,466 712,00 €
Percentage of investment
: 0,92 %0,92 %
Municipality
Vila Real de Santo António
:Approved amount
: 24672919 €,24 672 919,00 €
Amount spent
: 13115522 €,13 115 522,00 €
Percentage of investment
: 6,02 %6,02 %
Total
Approved amount
: 410077987 €,410 077 987,00 €
Amount spent
: 82738428 €,82 738 428,00 €
Percentage of investment
Region
Autonomous Region of the Azores
:Sub-region
Autonomous Region of the Azores
:Municipality
Vila do Porto
:Approved amount
: 8206966 €,8 206 966,00 €
Amount spent
: 2886606 €,2 886 606,00 €
Percentage of investment
: 1,35 %1,35 %
Municipality
Lagoa
:Approved amount
: 15919086 €,15 919 086,00 €
Amount spent
: 3882483 €,3 882 483,00 €
Percentage of investment
: 2,62 %2,62 %
Municipality
Nordeste
:Approved amount
: 3943216 €,3 943 216,00 €
Amount spent
: 1065086 €,1 065 086,00 €
Percentage of investment
: 0,65 %0,65 %
Municipality
Ponta Delgada
:Approved amount
: 324337880 €,324 337 880,00 €
Amount spent
: 96057501 €,96 057 501,00 €
Percentage of investment
: 53,28 %53,28 %
Municipality
Povoação
:Approved amount
: 798762 €,798 762,00 €
Amount spent
: 265644 €,265 644,00 €
Percentage of investment
: 0,13 %0,13 %
Municipality
Ribeira Grande
:Approved amount
: 84277619 €,84 277 619,00 €
Amount spent
: 9834226 €,9 834 226,00 €
Percentage of investment
: 13,84 %13,84 %
Municipality
Vila Franca do Campo
:Approved amount
: 7281606 €,7 281 606,00 €
Amount spent
: 941563 €,941 563,00 €
Percentage of investment
: 1,2 %1,20 %
Municipality
Angra do Heroísmo
:Approved amount
: 105669238 €,105 669 238,00 €
Amount spent
: 24442855 €,24 442 855,00 €
Percentage of investment
: 17,36 %17,36 %
Municipality
Praia da Vitória
:Approved amount
: 5020135 €,5 020 135,00 €
Amount spent
: 1312328 €,1 312 328,00 €
Percentage of investment
: 0,82 %0,82 %
Municipality
Santa Cruz da Graciosa
:Approved amount
: 537026 €,537 026,00 €
Amount spent
: 348135 €,348 135,00 €
Percentage of investment
: 0,09 %0,09 %
Municipality
Calheta
:Approved amount
: 465054 €,465 054,00 €
Amount spent
: 311567 €,311 567,00 €
Percentage of investment
: 0,08 %0,08 %
Municipality
Velas
:Approved amount
: 904342 €,904 342,00 €
Amount spent
: 524010 €,524 010,00 €
Percentage of investment
: 0,15 %0,15 %
Municipality
Lajes do Pico
:Approved amount
: 1229339 €,1 229 339,00 €
Amount spent
: 214985 €,214 985,00 €
Percentage of investment
: 0,2 %0,20 %
Municipality
Madalena
:Approved amount
: 8554077 €,8 554 077,00 €
Amount spent
: 1350567 €,1 350 567,00 €
Percentage of investment
: 1,41 %1,41 %
Municipality
São Roque do Pico
:Approved amount
: 360064 €,360 064,00 €
Amount spent
: 169168 €,169 168,00 €
Percentage of investment
: 0,06 %0,06 %
Municipality
Horta
:Approved amount
: 40231196 €,40 231 196,00 €
Amount spent
: 12174844 €,12 174 844,00 €
Percentage of investment
: 6,61 %6,61 %
Municipality
Lajes das Flores
:Approved amount
: 706349 €,706 349,00 €
Amount spent
: 44841 €,44 841,00 €
Percentage of investment
: 0,12 %0,12 %
Municipality
Santa Cruz das Flores
:Approved amount
: 217217 €,217 217,00 €
Amount spent
: 127831 €,127 831,00 €
Percentage of investment
: 0,04 %0,04 %
Municipality
Corvo
:Approved amount
: 78257 €,78 257,00 €
Amount spent
: 62632 €,62 632,00 €
Percentage of investment
: 0,01 %0,01 %
Total
Approved amount
: 608737427 €,608 737 427,00 €
Amount spent
: 156016871 €,156 016 871,00 €
Percentage of investment
Region
Autonomous Region of Madeira
:Sub-region
Autonomous Region of Madeira
:Municipality
Calheta
:Approved amount
: 835954 €,835 954,00 €
Amount spent
: 309404 €,309 404,00 €
Percentage of investment
: 0,14 %0,14 %
Municipality
Câmara de Lobos
:Approved amount
: 13597584 €,13 597 584,00 €
Amount spent
: 912267 €,912 267,00 €
Percentage of investment
: 2,2 %2,20 %
Municipality
Funchal
:Approved amount
: 518258153 €,518 258 153,00 €
Amount spent
: 104487071 €,104 487 071,00 €
Percentage of investment
: 83,89 %83,89 %
Municipality
Machico
:Approved amount
: 2376151 €,2 376 151,00 €
Amount spent
: 563714 €,563 714,00 €
Percentage of investment
: 0,38 %0,38 %
Municipality
Ponta do Sol
:Approved amount
: 3919322 €,3 919 322,00 €
Amount spent
: 710886 €,710 886,00 €
Percentage of investment
: 0,63 %0,63 %
Municipality
Porto Moniz
:Approved amount
: 115500 €,115 500,00 €
Amount spent
: 32102 €,32 102,00 €
Percentage of investment
: 0,02 %0,02 %
Municipality
Ribeira Brava
:Approved amount
: 3735487 €,3 735 487,00 €
Amount spent
: 1356693 €,1 356 693,00 €
Percentage of investment
: 0,6 %0,60 %
Municipality
Santa Cruz
:Approved amount
: 19307882 €,19 307 882,00 €
Amount spent
: 2860686 €,2 860 686,00 €
Percentage of investment
: 3,13 %3,13 %
Municipality
Santana
:Approved amount
: 259475 €,259 475,00 €
Amount spent
: 104147 €,104 147,00 €
Percentage of investment
: 0,04 %0,04 %
Municipality
São Vicente
:Approved amount
: 36624865 €,36 624 865,00 €
Amount spent
: 6987684 €,6 987 684,00 €
Percentage of investment
: 5,93 %5,93 %
Municipality
Porto Santo
:Approved amount
: 18779263 €,18 779 263,00 €
Amount spent
: 4508318 €,4 508 318,00 €
Percentage of investment
: 3,04 %3,04 %
Total
Approved amount
: 617809634 €,617 809 634,00 €
Amount spent
: 122832971 €,122 832 971,00 €
Percentage of investment
Region
Nation-wide investment
:Approved amount
: 4270349768 €,4 270 349 768,00 €
:Amount spent
: {{ regionNutsii.apoio_gasto|floatformat:'-2'|cut:' '|checkifdataisavailable|euro_symbol,1 113 379 679,00 €
:Comparison between realities
Assessing the impact of investments in the Recovery and Resilience Plan on the daily lives of populations is not a simple topic. It is necessary to analyze the context in a broader way and understand how investments can suppress everyday needs.
However, there are some indicators that can help to envision an equitable way in which investments are being distributed geographically.
How much is already approved to invest per inhabitant?
How much is already approved to invest per inhabitant?
Municipality | Approved amount |
---|---|
Highest national amount Mértola | 9596 € 9 596,00 € |
National average | 1728 € 1 728,00 € |
Lowest national amount Santana | 35 € 35,00 € |
How much is already approved to invest per inhabitant?
Municipality
Highest national amount Mértola
Approved amount
9596 €
9 596,00 €
Municipality
National average
Approved amount
1728 €
1 728,00 €
Municipality
Lowest national amount Santana
Approved amount
35 €
35,00 €
How much is already approved to invest per km2?
How much is already approved to invest per km2?
Municipality | Approved amount |
---|---|
Highest national amount Lisboa | 24376699 € 24 376 699,00 € |
National average | 192650 € 192 650,00 € |
Lowest national amount Alter do Chão | 827 € 827,00 € |
How much is already approved to invest per km2?
Municipality
Highest national amount Lisboa
Approved amount
24376699 €
24 376 699,00 €
Municipality
National average
Approved amount
192650 €
192 650,00 €
Municipality
Lowest national amount Alter do Chão
Approved amount
827 €
827,00 €
If you'd like to know more about a specific municipality, tell us which one...