Projeto Lusitano - Agenda Mobilizadora para a Inovação Empresarial da Indústria Têxtil e do Vestuário de Portugal

Project sheet

Name

Projeto Lusitano - Agenda Mobilizadora para a Inovação Empresarial da Indústria Têxtil e do Vestuário de Portugal

Total project amount

55,28 million €

Amount paid

17,29 million €

Non-refundable funding

55,28 million €

Loan funding

0 €

Start date

01.07.2021

Expected end date

30.06.2026

Dimension

Resilience

Component

Investment and innovation

Investment

Mobilizing Agendas/Alliances for Business Innovation

Operation code

02/C05-i01.01/2022.PC644933224-00000043

Summary

O Projeto Lusitano visa promover a reindustrialização da Indústria Têxtil e de Vestuário (ITV) nacional, por via do desenvolvimento de raiz de um projeto que permita trazer de volta à Europa uma parte crucial da cadeia de valor da indústria têxtil e do vestuário, através de atividades de I&D, Inovação Produtiva, Formação e Internacionalização criando a capacidade de fabricar fios de fibras recicladas e naturais, e subsequentemente, novos e inovadores produtos têxteis e de vestuário de superior valor acrescentado. Pretende, ainda, promover a transformação competitiva do setor através de esforços concertados de I&D de sistemas inteligentes, alinhados com os paradigmas de Indústria 4.0 e Internet of Things, e de sistemas de tratamento e reaproveitamento de efluentes, de modo a reduzir drasticamente o consumo de recursos hídricos. Por fim, pretende-se ainda promover e disseminar os seus resultados, gerando um efeito de contágio para as demais entidades.

Beneficiaries

Within the scope of the Recovery and Resilience Plan, two types of beneficiaries are responsible for carrying out the projects and using the funding provided. Due to their similar role, the reference to these two types of beneficiaries has been simplified and unified under the term "Beneficiary".
The two types are::
  • Direct Beneficiaries are those whose funding and projects to implement are part of the Recovery and Resilience Plan that has been negotiated and approved by the European Union;
  • Final Beneficiaries are those whose funding and projects to implement are approved following a selection process through Calls for Applications.

Call for applications

As part of the Call for Applications, submissions are requested to select the projects and final beneficiaries to whom funding will be awarded. Specific selection criteria are defined for each call, which must be reflected in the applications submitted and assessed.

The project is appraised on the basis of its compliance with the selection criteria laid down in the calls for applications, and a final score may be awarded, where applicable.

Final evaluation score

4,0
Important note

The components for calculating the assessment score can be found in the selection criteria document mentioned below.

Selection criteria

The funding selection criteria to which this project and its final beneficiary were subject and its score can be found in detail on the Recuperar Portugal platform.

Beneficiaries

Beneficiaries

Procurement

Beneficiaries representing public entities implement their project by signing one or more contracts with suppliers for goods or services through public procurement procedures.

To ensure and provide the utmost transparency in all these contracts, a list of the contracts that were signed under this project is available here, along with the information available on the Base.Gov platform. Please note that, according to the legislation in force at the time the contract was signed, some exceptions do not require the publication of the contracts signed on this platform, and, therefore, no information is available in such cases.

Geographic distribution

55,28 million €

Total amount of the project

Percentage of the amount already paid for implementing projects

, 31,3 %,

Where was the money spent

By county

10 counties financed .

  • Lousada 25,19 million € ,
  • Vila Nova de Famalicão 12,21 million € ,
  • Covilhã 7,64 million € ,
  • Fundão 3,76 million € ,
  • Santo Tirso 3,11 million € ,
Source AD&C, EMRP